300 MW cOAL AND BIOMASS second hand POWER PLANT for sale
300 MW COAL AND BIOMASS SECOND HAND POWER PLANT FOR SALE
Complete power plant 300 MW BBC - ABB
COAL - OIL - GAS - BIOMASS fired
265.000 hours overhauled: 2006 (HD, MD, LD), 45.000 hours after overhaul, in production until 1/05/2013.
Swap HD rotor in nov 2010 only 13.300 hours until now.
189 kg / cm2, 540° C 3000 t/min
Alternator ACEC TC 1498 cooling: Hydrogen 22 kV 3000 tr 1550 kVa
Main trafo: Westinghouse 375 MVA 156/ 22 kV coupled trafo: Alsthom 20 MVA 22 / 6.4 kV
Start trafo: Alsthom 20 MVA 71.5/6.4 kV
Fuelpumps: ID:3 / HD:3 LD:2881/HD:2223 16 burners tangential
Coal grinding mills: 2 x Loesche LM 20.20D 45t/hr.
Biomass power generation by Gasifier 20 MWe fired by wood derived wastes cut into chips.
Biomass plant, 120.000 t/year, 30 MWe.
Complete sawdust installation.
Installed in 2009 as new SO2/NOX plant, installation to decrease sulfur dioxide and nitrogen oxide.
Biomass plant decreases CO2 emissions.
NEW in 2010 complete control system SIEMENS.
Boiler is overhauled in 2009.
Foreseen operation for complete plant until 2020.
Easy to dismantle, overhead crane, no asbestos.
For detailed information contact with us.
Complete power plant 300 MW BBC - ABB
COAL - OIL - GAS - BIOMASS fired
265.000 hours overhauled: 2006 (HD, MD, LD), 45.000 hours after overhaul, in production until 1/05/2013.
Swap HD rotor in nov 2010 only 13.300 hours until now.
189 kg / cm2, 540° C 3000 t/min
Alternator ACEC TC 1498 cooling: Hydrogen 22 kV 3000 tr 1550 kVa
Main trafo: Westinghouse 375 MVA 156/ 22 kV coupled trafo: Alsthom 20 MVA 22 / 6.4 kV
Start trafo: Alsthom 20 MVA 71.5/6.4 kV
Fuelpumps: ID:3 / HD:3 LD:2881/HD:2223 16 burners tangential
Coal grinding mills: 2 x Loesche LM 20.20D 45t/hr.
Biomass power generation by Gasifier 20 MWe fired by wood derived wastes cut into chips.
Biomass plant, 120.000 t/year, 30 MWe.
Complete sawdust installation.
Installed in 2009 as new SO2/NOX plant, installation to decrease sulfur dioxide and nitrogen oxide.
Biomass plant decreases CO2 emissions.
NEW in 2010 complete control system SIEMENS.
Boiler is overhauled in 2009.
Foreseen operation for complete plant until 2020.
Easy to dismantle, overhead crane, no asbestos.
For detailed information contact with us.